Syclone#1992
SyTy.net Moderator
Re: Project Never Ends
Gonna be ready by the 23rd of June
?
Gonna be ready by the 23rd of June
Syclone#1992 said:Gonna be ready by the 23rd of June?
Syclone#1992 said:Gonna be ready by the 23rd of June?
Six-is-Enough said:Looking Good. I am glad you wondered out to the garage and got something done!
Daron said:The only way that Typhoon is gonna get done this year is if you and Doobie put one of these in each downpipe:
![]()
vortecfiero said:hmmm a waste gate operated thermostat housing...
so when the the boost pressure gets to high the engine
gets a massive amount of hot coolant to ummm aid in the
adibiatic (sp) ummm plasma induction ummm thingy?
lol jk the engine looks amazing !![]()
![]()
skwayb said:LOL I almost fell out of my chair when I saw this.. LOL
SeattleSy#1255 said:two questions:
what heads are you using?
do you think those turbo brackets are neccessary or just a good "extra" to have? It hard to tell in the pictures. I like them regardless.
SeattleSy#1255 said:didn't I see one of those laying in the back seat of the ty last time I was over?![]()
skwayb said:LOL. I thought you took it because it disappeared after you were over.![]()