so i decided to start the bodywork on my syclone...i will be assembling and installing the new engine before the cab goes back in...although it drives or should i say drove like new, this truck is in worse shape than i thought...there was alot of stuff bolted in the back of this truck that we've since removed...we repaired around 85 holes, in the bed alone...anywhere from "self tapping sheetmetal screw" size to 2" diameter hole-saw size...slow week due to heavy rains, so i borrowed a couple of "hands" from my tire business...the bodywork took us a week (between 2 and 4 people including myself at all times) working from 8am to around midnite every day of this past week as well as all day saturday...probably well over 100 hrs so far...i think the hard part is done...