Thanks Jimmy--SyTy Jim-- said:WOW!! Nice Morgan! Good Luck with the project and I'll be sure to keep an eye on this thread for your progress.
:tup:
Jimmy
Lighting will hopefully not be a problem, Im working with someone now to get the best lighting possible.WyoSyclone said:A few things I learned after building my first shop....
1) make sure you put in provisions for a row of florescent lights along the wall in front of where the truck is being worked on - a drop light is OK, but there's nothing like having a wall of lights in front of the truck. If you have one 'work bay' put one row at about 5' up, and the second right at 8' (I'm assuming you'll have high ceilings).
All depends on cost, not 100% on what route we're going with.2) Unless you're using high pressure sodium fixtures, make sure you use the new t-8 florescent bulbs and digital ballasts -much better in cooler weather, use a lot less energy, have a better pattern, and start up faster.... the sodiums are nice :tup:![]()
Outlets are probably going every 8' (thats what the existing shop has), but 6' might be doable as well, not like its gonna cost anymore. As for the drop downs, not gonna happen. I hate them, my buddy hates them, and most importantly we're planning on making an i-beam rig with a chainfall so we can lift out and move anything, anywhere in the building, so nothing will be hanging down.3) outlets every 6' on the wall, plus a few drop-downs for cord reels, etc.
already done/will be doing4) TV and stereo wiring - may not use it now, but can be nice in the future.
Flood lights are already going up, installing sensors can be an after thought, but nothing will really trip them as the whole yard will be fenced in soon.5) Wiring for external motion sensor lighting on all four exterior walls. Yes, you'll see a lot of deer and rabbits tripping them, but worth the piece of mind.
:rotf: :rotf: :rotf: 220... this place is gonna have 3-phase in it, ill probably have almost as many 220 outlets as I do 110's6) 220 for compressor/ welder, etc...... CAT5 (or wireless) for computer...
thank you for the tips. Just about everything has been mapped/planned with exception to the radiant heat and where the lift is going to go exactly.I'm sure you've got most of this mapped out, just thought I'd share some of the things I did/didn't do!
Captain Morgan said:As for the drop downs, not gonna happen. I hate them, my buddy hates them, and most importantly we're planning on making an i-beam rig with a chainfall so we can lift out and move anything, anywhere in the building, so nothing will be hanging down.
If Dave were here....he would be leaving me to move in there with you![]()
Lisa
MsMyclone
that looks like lots of work
my guess is that you're not going to epoxy coat the whole floor, so are you planning on leaving it bare? maybe a stain of some sort?