|||||||||| [ Project : New Shop ] ||||||||||

Ty0279

Historically Significant
Re: |||||||||| [ Project : New Shop ] ||||||||||

Wow that's going to be awesome! You can never have too much garage space! :cool:
 

--SyTy Jim--

GAST Member
Re: |||||||||| [ Project : New Shop ] ||||||||||

WOW!! Nice Morgan! Good Luck with the project and I'll be sure to keep an eye on this thread for your progress.

:tup:
Jimmy
 

Captain Morgan

Moderated User
Re: |||||||||| [ Project : New Shop ] ||||||||||

--SyTy Jim-- said:
WOW!! Nice Morgan! Good Luck with the project and I'll be sure to keep an eye on this thread for your progress.

:tup:
Jimmy
Thanks Jimmy

here's some more progress.

Day 5

All poles are up, skirt boards in place and concrete coming tomorrow for the footings.


 

Captain Morgan

Moderated User
Re: |||||||||| [ Project : New Shop ] ||||||||||

Day 6

Concrete for the footings poured. Unfortunately, thats all that happened that day.



Day 7

Finally got to spend a full day on the shop. Holes refilled with dirt, started framing up 2 of the walls.


 

MikeRenz

not stock
Re: |||||||||| [ Project : New Shop ] ||||||||||

i like the cutaway into the garage...i bet that was a fun day.

This is lookin sweet. When are you trying to have it done by?
 

Captain Morgan

Moderated User
Re: |||||||||| [ Project : New Shop ] ||||||||||

shooting to get the "building" part done by the end of the month. Not sure if that will include the slab and electrical or not.
 

WyoSyclone

Active member
Re: |||||||||| [ Project : New Shop ] ||||||||||

A few things I learned after building my first shop....
1) make sure you put in provisions for a row of florescent lights along the wall in front of where the truck is being worked on - a drop light is OK, but there's nothing like having a wall of lights in front of the truck. If you have one 'work bay' put one row at about 5' up, and the second right at 8' (I'm assuming you'll have high ceilings).
2) Unless you're using high pressure sodium fixtures, make sure you use the new t-8 florescent bulbs and digital ballasts -much better in cooler weather, use a lot less energy, have a better pattern, and start up faster.... the sodiums are nice :tup: :D
3) outlets every 6' on the wall, plus a few drop-downs for cord reels, etc.
4) TV and stereo wiring - may not use it now, but can be nice in the future.
5) Wiring for external motion sensor lighting on all four exterior walls. Yes, you'll see a lot of deer and rabbits tripping them, but worth the piece of mind.
6) 220 for compressor/ welder, etc...... CAT5 (or wireless) for computer...

I'm sure you've got most of this mapped out, just thought I'd share some of the things I did/didn't do!
 

Captain Morgan

Moderated User
Re: |||||||||| [ Project : New Shop ] ||||||||||

WyoSyclone said:
A few things I learned after building my first shop....
1) make sure you put in provisions for a row of florescent lights along the wall in front of where the truck is being worked on - a drop light is OK, but there's nothing like having a wall of lights in front of the truck. If you have one 'work bay' put one row at about 5' up, and the second right at 8' (I'm assuming you'll have high ceilings).
Lighting will hopefully not be a problem, Im working with someone now to get the best lighting possible.
2) Unless you're using high pressure sodium fixtures, make sure you use the new t-8 florescent bulbs and digital ballasts -much better in cooler weather, use a lot less energy, have a better pattern, and start up faster.... the sodiums are nice :tup: :D
All depends on cost, not 100% on what route we're going with.
3) outlets every 6' on the wall, plus a few drop-downs for cord reels, etc.
Outlets are probably going every 8' (thats what the existing shop has), but 6' might be doable as well, not like its gonna cost anymore. As for the drop downs, not gonna happen. I hate them, my buddy hates them, and most importantly we're planning on making an i-beam rig with a chainfall so we can lift out and move anything, anywhere in the building, so nothing will be hanging down.
4) TV and stereo wiring - may not use it now, but can be nice in the future.
already done/will be doing
5) Wiring for external motion sensor lighting on all four exterior walls. Yes, you'll see a lot of deer and rabbits tripping them, but worth the piece of mind.
Flood lights are already going up, installing sensors can be an after thought, but nothing will really trip them as the whole yard will be fenced in soon.
6) 220 for compressor/ welder, etc...... CAT5 (or wireless) for computer...
:rotf: :rotf: :rotf: 220... this place is gonna have 3-phase in it, ill probably have almost as many 220 outlets as I do 110's ;)

I'm sure you've got most of this mapped out, just thought I'd share some of the things I did/didn't do!
thank you for the tips. Just about everything has been mapped/planned with exception to the radiant heat and where the lift is going to go exactly.
 

canadian

sy in progress
Re: |||||||||| [ Project : New Shop ] ||||||||||

Captain Morgan said:
As for the drop downs, not gonna happen. I hate them, my buddy hates them, and most importantly we're planning on making an i-beam rig with a chainfall so we can lift out and move anything, anywhere in the building, so nothing will be hanging down.

How are you going to run power for the lifts? Wouldn't those be drop-downs from the ceiling? Run two 110's, a 220, and an air line to a spot right above the lift and you're golden. Not sure if you're over there yet, but check out http://www.garagejournal.com as they have a lot of information and tips.
 

Captain Morgan

Moderated User
Re: |||||||||| [ Project : New Shop ] ||||||||||

Day, who the F cares at this point

Siding is finished, ridge cap installed, just need the corner trim and roof end caps installed and the exterior is complete. Roll up doors and ceiling joists are all that remain after that before we get our final.

Also looking to go a different route other than the radiant heat in the floor. Supposedly a friend of a friend has been doing heating/cooling in large commercial warehouses for years and says there are better and cheaper options, so we'll see.

Click on thumbnail for larger view;
 

alwayswantedone

Donating Member
Re: |||||||||| [ Project : New Shop ] ||||||||||

Looking good Morgan. Sorry I missed your party... well and forgot to call. Got stuck waiting for an idiot to call me about getting some tires and then it was too late. Next time I am down in NJ I will have to come out and see it if you are around.
 

myclone

Donating Member
Re: |||||||||| [ Project : New Shop ] ||||||||||

If Dave were here....he would be leaving me to move in there with you :)

Lisa
MsMyclone
 

Captain Morgan

Moderated User
Re: |||||||||| [ Project : New Shop ] ||||||||||

If Dave were here....he would be leaving me to move in there with you :)

Lisa
MsMyclone

Not a chance sweetie, Dave was a wise man and althought he loved his toys too, I doubt he would pick working on them over you. ;)
 

Captain Morgan

Moderated User
Re: |||||||||| [ Project : New Shop ] ||||||||||

Just a little update for everyone.

After about a month of delays and friends who have concrete experience backing out of helping out with pouring the slab at last minute, my friend decided to have the slab poured by a local contractor last Thursday. It probably evened out in the end in terms of cost considering they had 6 guys and all the equipment to do it, plus made all the arrangements for the concrete deliverly, ect ect. By the time we would have rented the equipement and everything else, it was probably a lot smarter this way.

Click on thumbnail for larger view;


Pics are kinda crappy, it was raining out so getting a good shot was tough. Ill get some finished pics tomorrow for everyone :tup:
 

Raist103

Engine Killer, iPhone Killer, Lawnmower Killer
Re: |||||||||| [ Project : New Shop ] ||||||||||

that looks like lots of work
 

Captain Morgan

Moderated User
Re: |||||||||| [ Project : New Shop ] ||||||||||

that looks like lots of work

yeah it was, 44 yards I think it took.

Here are some pics I grabbed real quick this morning, I didnt have a lot of time, but how many pics of concrete can one really take, lol

Click on thumbnail for larger view;



Yummmm, fibercrete, lol

 

Captain Morgan

Moderated User
Re: |||||||||| [ Project : New Shop ] ||||||||||

my guess is that you're not going to epoxy coat the whole floor, so are you planning on leaving it bare? maybe a stain of some sort?

we might, it depends on if we can get the stuff through some other route besides retail, otherwise its gonna cost like $2100 :lol:

We already know someone who has enough sealer to do the whole floor, just need to weigh the options and see whats best for the floor and pocket.
 
Top